Structural Repairs

2010

  • Dropped keep and inspected stainless steel bolts - excellent condition
  • Replaced several planks
  • Replaced deck - marine ply with dynel set in expoy
  • New toe rail

2011

  • Replaced several planks
  • Replaced (9) frames in head and locker area
  • Replaced stem knee

2014

  • Dropped ballast and replaced keel and fore keel; installed (8) new floors; Installed (10) partial sister frames; keel bolts removed and reinstalled - excellent condition
  • Replace stern knee; installed (6) new floors and (4) partial sisters
  • Built new 5' mast step
  • Keel, knees and mast step out of Angelique; Planking out of Wana, oak frames
  • Repaired bronze stem head